img
Testing commissioning Overhauling of distribution Transformer

Winding resistance test of transformer Transformer ratio test Transformer vector group test Measurement of impedance voltage/short circuit impedance (principal tap) and load loss (Short circuit test) Measurement of no-load loss and current (Open circuit test) Measurement of insulation resistance Dielectric tests of transformer Temperature rise test of transformer Tests on on-load tap-changer Vacuum tests on tank and radiators

Services

View All

Why Choose Us

img

Why

Supporting Industry Measurement Management Systems By Callibation, Partner For Development Success And Growth.

img

Who

GreaseMates - ISO 17025:2017 Accredited Third Party Callibration Laboratory Of India

img

How

Entry check: Check the instrument for defects and then Perform calibration. Here you compare the instrument at specific measurement points at last If the instrument falls outside the tolerances, you can possibly adjust the instrument and finalise the calibration results.

img
img
img
img
img
img
img
img
img

Testimonial

Power Sector Professional with 16yrs. of Project Execution & O&M Experience in Renewable Energy (Solar & Wind), Thermal Power Plants, Transmission Lines Projects in India, Northern & Western Africa, Middle East Region & Latin America Countries.

profile

A Kambhoj

Nice Job by team dedicated persons appreciate the work.

profile

Saurav Gupta